New 3 Bedroom Pool Villas for Sale in Maenam

Sold
Maenam, Koh Samui
Sold
Secure the final 3 bedroom private pool villa in an exclusive Maenam boutique project. Large land plot, flexible ownership options, and strong rental potential.

Maenam

Villa

3 Bedrooms

3.5 Bathrooms

Description

This is a rare opportunity to secure the last remaining 3-bedroom private pool villa in an exclusive boutique development in Maenam, Koh Samui. With only two villas in the entire project and just one now available, this property offers a level of privacy and space that is increasingly hard to find on the island.

Set on a generous 574 Sq.M land plot, the villa has been thoughtfully designed for relaxed tropical living, featuring high ceilings, excellent airflow, and a seamless indoor–outdoor layout. The open-plan living, dining, and kitchen area connects directly to a large, nearly fully covered pool terrace, making it ideal for year-round use. Direct internal access from the covered parking into the kitchen adds everyday convenience, while the saltwater swimming pool and landscaped garden create a calm, private atmosphere.

Located in a quiet residential area yet just a short drive to the main road and Maenam Beach, the villa is perfectly suited for both long-term living and rental investment. With leasehold or freehold options available and a flexible construction payment schedule, this final villa represents outstanding value in one of Koh Samui’s most desirable residential locations.

Leasehold and Freehold Property Ownership in Thailand

Read more

Key features

✓ Quiet residential setting in Maenam ✓ Boutique project with only 2 villas ✓ High ceilings for enhanced light and airflow ✓ Nearly fully covered pool terrace for year-round use ✓ Direct internal access from parking to kitchen ✓ Suitable for residence or rental investment ✓ Leasehold (30 Years) or Freehold Ownership ✓ Construction period approx. 8 months after permit approval ✓ Step-by-step payment schedule during construction

Specifications

✓ Land Size: 574 Sq.M ✓ Built Area: 263 Sq.M ✓ 3 Bedrooms ✓ 3 Bathrooms + 1 Guest Toilet ✓ Western Kitchen with Island ✓ Open-Plan Dining Area ✓ Bright Open Living Space (Approx. 50 Sq.M) ✓ Private Saltwater Swimming Pool (8m x 4m) ✓ Covered Parking for 2 Cars ✓ Laundry & Storage Room

Extra Infos

✓ Government Electricity ✓ Deep Well Water ✓ Optional Upgrades: Gym/Office Room, Solar Panels, CCTV, Electric Gate, Water Boiler ✓ Distance: 1.6 km to Main Road / 1.9 km to Beach (Approx. 5-Minute Drive)

Floor Plan

Location

Start Price THB 8.89M

Sold

11575
Optional
Chanote
574
263
Optional
Yes
Similar Properties
in Maenam
Not Ready to Buy Yet? Rent a Luxury Villa

Experience Koh Samui in a private villa. We have access to 250+ exclusive villas, curated directly from trusted owners.

Explore Luxury Rentals →

Koh Samui Villas ROI Calculator

Calculate your investment returns for Samui villa rentals

55%
15%

Monthly Running Costs

฿9,500
฿4,000
฿2,500
฿3,000
฿0
Total Monthly Costs
฿19,000
–
–
–

💡 Breakdown

Gross Income–

Mgmt & Fees–

Running Costs–

Net Annual : –

📊 ROI by Occupancy

Occ %ROI %